Dubai’s Roads and Transport Authority (RTA) has unveiled a new 1,210-meter bridge, boosting traffic efficiency between Infinity Bridge and Sheikh Rashid Road. Part of Phase 4 of the Al Shindagha Corridor Improvement Project, the bridge accommodates 4,800 vehicles per hour. The project includes five bridges spanning 3.1 km, with a total capacity of 19,400 vehicles per hour. Enhancing connectivity across key districts, it aims to reduce travel time from 104 to 16 minutes by 2030, supporting Dubai’s long-term infrastructure and economic growth.
Dubai RTA’s new bridge increases capacity by 4,800 vehicles/hour

Anamika Chauhan is a Senior Content Writer at TBO Academy. Specializing in B2B content, she works closely with the marketing team to bring out the outlook about the industry in her write-ups. Connect with her on LinkedIn or write to her at anamika.chauhan@tbo.com