Gujarat Metro Rail Corporation has invited bids for a ₹860-crore elevated metro corridor connecting Thaltej Gam and Godhavi in Ahmedabad. The 10.26-km stretch will include eight elevated stations and electrical and mechanical works. The project aims to improve connectivity across western Ahmedabad, linking residential and commercial areas with the expanding metro network. Construction is expected to take 32 months after the contract is awarded.
Ahmedabad Metro Plans 10.26-km Thaltej–Godhavi Corridor

Anamika Chauhan is a Senior Content Writer at TBO Academy. Specializing in B2B content, she works closely with the marketing team to bring out the outlook about the industry in her write-ups. Connect with her on LinkedIn or write to her at anamika.chauhan@tbo.com