Gujarat Metro Rail Corporation has invited bids for a ₹860-crore elevated metro corridor connecting Thaltej Gam and Godhavi in Ahmedabad. The 10.26-km stretch will include eight elevated stations and electrical and mechanical works. The project aims to improve connectivity across western Ahmedabad, linking residential and commercial areas with the expanding metro network. Construction is expected to take 32 months after the contract is awarded.