Melbourne’s Metro Tunnel has entered full peak-hour operations, significantly boosting train frequency and capacity across key city lines. Trains now arrive every three minutes during peak periods, improving reliability and reducing congestion. Since opening in November 2025, the tunnel has carried over 800,000 passengers. Authorities say the project marks a major milestone in strengthening Australia’s urban public transport infrastructure.
Melbourne Metro Tunnel Enters Full Peak-Hour Operations Phase

Anamika Chauhan is a Senior Content Writer at TBO Academy. Specializing in B2B content, she works closely with the marketing team to bring out the outlook about the industry in her write-ups. Connect with her on LinkedIn or write to her at anamika.chauhan@tbo.com